Email:linda@662n.com Mob:+8613924100039(WhatsAPP)
Wechat:airspringG Skype:guomat
| Place of Origin: | GuangDong, China |
| Brand Name: | GUOMAT |
| Certification: | ISO/TS16949:2009 |
| Model Number: | 1B200-10 |
| Minimum Order Quantity: | 6pcs |
|---|---|
| Price: | $49.9-59.9/pc |
| Packaging Details: | Strong Carton Box Or As Customers Need |
| Delivery Time: | 2-8 work days |
| Payment Terms: | T/T, Western Union, L/C |
| Supply Ability: | 1000pcs/week |
| Material: | Rubber And Steel | Warranty: | 12 Months |
|---|---|---|---|
| Function: | Reduce Shock | Bellow Number: | 1B12 |
| Phoenix: | SP1B12 / SP1B12-1 | Firestone: | W01-M58-6374 |
| Air Fitting: | G3/4 | Screw: | M8X1.25 |
| Highlight: | Phoenix industrial air spring,Contitech rubber air spring,G3/4 gas-filled air spring |
||
| Parameter | Value |
|---|---|
| Top Cover Plate Diameter | 160mm |
| Bottom Cover Plate Diameter | 160mm |
| Gas Hole / Air inlet | G3/4 |
| Rubber Bellows Natural Diameter | 220mm |
| The Working Stroke | MAX 180 mm to MIN 57 mm |
| Top Cover Plate Screw (Nut) Tooth | 2XM8X1.25 |
| Bottom Cover Plate Screw (Nut) Tooth | 2XM8X1.25 |
| Screw Center Distance of Top Cover Plate | 89mm |
| Distance From Screw to Air Hole | 38mm |
| Screw Center Distance of Bottom Cover Plate | 89mm |
| Step | Core Action | Key Point |
|---|---|---|
| 1. Prepare | Power off and disconnect water. Use a jack to lift each corner of the machine one at a time. Remove the old feet. | Safety first! Only lift one corner at a time and secure it with blocks. |
| 2. Install | Position the air springs. Use bolts to secure the top end firmly to the machine's base. | The bottom end usually just needs to sit flat on the floor. |
| 3. Connect | Use air hoses to connect the air inlets of all four air springs in a series. | This ensures equal air pressure across the system. |
| 4. Level | Inflate the springs slowly and remove the jack. Use a spirit level and adjust air pressure until the machine is perfectly level. | This is the most critical step for vibration reduction. |
| 5. Test | Inflate to the specified pressure. Run a high-speed spin cycle first empty, then with load, to check for stability. | Once set, no further adjustment is needed for normal operation. |
Contact Person: Sunny
Tel: 18928788039